Weathering at centre of roof
The completed roof was topped with a central capping piece at the intersection of all of the lead covered rolls. This was bossed from 4 pieces of lead and dressed around the rolls. The fitted pieces were then leadburned together to form a weathertight flashing at the roof apex and clips welded and turned to secure against windlift.
![]() |


